When the shelves need to be dismantled and reinstalled, the construction unit, together with the change plan design, construction and third-party inspection units and other departments, will conduct a comprehensive inspection of whether the change plan meets the planning and design requirements and the construction and installation quality, and obtain whether the project change is qualified. Information, data and document processes.
Copyright ? 2002-2024 北京思特博貨架制造有限公司 版權(quán)所有 ICP:京ICP備16033024號(hào)
TEL
WECHAT